Decisions · Compare Lab
Which protection works best on your tower?
Enter the tower, soil and line data. Build a list of protection schemes: a grounding option, line arresters, or both. The lab ranks them by flashover rate (effective) and by cost per avoided flashover (efficient).
1
Your tower
Start from a thesis tower or type your own values. Inputs are saved in this browser.
Tower geometry
Height to earth wire H (m)
Base width (m)
Earth wire offset ± (m)
Phase offset ± (m)
Top phase below H (m)
Middle phase below H (m)
Bottom phase below H (m)
Tower surge impedance (Ω)
Line and exposure
Span behind (m)
Span ahead (m)
Neighbour footing R₀ (Ω)
Ground flash density Ngflashes /km² /yr
Stroke front time (µs)
Soil and insulation
Soil resistivity ρ (Ω·m)
Existing footing R₀ (Ω)
Insulation CFO (kV)
Unit costs — placeholders, edit these
Currency label
Buried conductor (/m)
Down conductor on tower (/m)
Earth rod (each)
Post insulator (each)
Line arrester (each)
Labour on top (%)
Service life (years)
Conductor positions (to scale)
2
Protection schemes
The first row is the tower as it is today. Add, rename or remove the others.
3
Results
Calculating…
Flashover rate by scheme
per 100 km per yearbackflashovershielding failure
Cost against effect
lower-left is better
What the lab does and does not model.
- Grounding options use the drawings' defaults: MDG (4 rods of 1.8 m on a 4 m square), DGS (4 rods of 2 m, 150 kV standoffs) and counterpoise (radials at 1 m depth with 2 end rods each).
- Backflashover uses the Backflashover Lab model: gapped arresters (570 kV gap, 306 kV at 10 kA) that tie their phase to the tower only after sparkover, leader-progression insulators and an ionising footing, averaged over three power-frequency angles. Counterpoise uses the impulse-effective resistance. The DGS option keeps the screening model of the grounding pages.
- Insulation: the CFO field is the specification value (884 kV for 12 × U120B with horns). The leader model is scaled so that 884 kV corresponds to its 912.5 kV calibration (E₀·g); change the CFO and the gap scales with it. See the Insulation Lab.
- Shielding failure: the classical flat-terrain EGM (Love, r = 10·I0.65) at tower height for vertical leaders, plus the leader-angle exposure of the middle phase from the paper, WS = d/π between Ic = 2U/(kZc) and Imax. Valleys raise it further; see Span screening.
- Arrester energy, failures and the shift of risk to neighbouring towers are not modelled here; see Arrester duty and the Line Monte Carlo.
- Rates assume every tower is like this one. Cost and benefit are per tower. The default unit costs are placeholders, not quotations.